Stadtwerke: heat plans, local energy markets, no engineers
What municipal utilities face: heat plans that must become running networks, new local power-sharing rules and engineering projects that wait for people.
Book a free 30-minute callControl and optimisation since 2007: CERN helium cooling · IAV wind turbines · SkySails airborne wind
Energy and electrical engineering projects wait for engineers
What happens. Utilities have more projects than engineers: new heat sources, storage, control of networks, replacement of old controls. Open positions for electrical and energy engineers stay open for a long time, and the people who are there work on faults and daily business.
What it costs. Projects are delayed or never started, planned savings do not come, and the staff who are there carry the load until they leave as well.
Why the usual fix fails. Posting the job again changes little in a market where engineers have many offers. Agencies deliver people who need months to learn the network. A large engineering firm brings a team and an overhead that a project of this size does not carry.
How a fixed-price remote diagnosis checks it. From the project description, the plant data and the questions that are open I check which part can be handled as a defined task, for example a model, a control concept or an optimisation, with documentation that your own staff can continue. The fixed-price remote diagnosis shows what can be delivered at a fixed price, and what has to stay with your staff. Temporary agency work is the alternative where you need a person in the team.
New local electricity communities and storage rules create new planning tasks
What happens. In Switzerland, the new electricity law allows local electricity communities of consumers, producers and storage operators and sets minimum payments for feed-in (Federal Council). A utility or an industrial park can now share power among neighbours. Who gets which power at what time, from which source, is a daily question that did not exist before.
What it costs. Billing and operation are manual for a new product. Without a plan the community does not use its own generation, and the storage is operated by simple rules and earns less than it could.
Why the usual fix fails. A fixed split of the generation by share is easy and ignores the hours. A spreadsheet works for a few participants and fails with more. A software package for billing does not decide how to run the storage and the loads.
How a fixed-price remote diagnosis checks it. From the metering data of a site, the generation profile and the tariff rules I check how much a schedule of storage and flexible loads gains compared with the simple rule. The fixed-price remote diagnosis answers whether a planning tool for a community is worth building for your case.
Background: Economic predictive control
Municipal heat plans must become operating networks
What happens. Cities have to produce heat plans (Heat Planning Act), and the plans show new heat networks with heat pumps, storage, waste heat and a rising share of renewable sources. Between a plan and a network that runs stands the question of how the plant is operated: which source runs when, at which supply temperature.
What it costs. A heat network with many sources run by rules of thumb uses more electricity and fuel than needed, and feed-in temperatures that are too high raise losses and block waste heat and heat pumps.
Why the usual fix fails. An engineering study sizes the plant for a design day and not for the operation. Heat pumps run well only at a low supply temperature, and old customer installations need a high one. Operating by the experience of the dispatcher does not carry over to a network with many more sources.
How a fixed-price remote diagnosis checks it. From the plan, network data and demand profiles I check how a model of the network and an optimisation of the dispatch and the supply temperature would run the heat sources. The fixed-price remote diagnosis answers what such an operation could save in your network and what has to be measured first.
Background: Economic predictive control
More problems that concern this industry
These problems are described on the page of the industry where they matter most:
- The supply temperature follows the outdoor curve, mostly too hot (District heating operators)
- Boilers and engines face tighter nitrogen oxide and dust limits (Power and heat plant operators)
- Gas demand forecasts are wrong (Gas grid operators)
- Engine plants run by heat demand only (Power and heat plant operators)
- Several units sell into one market without a joint plan (Power and heat plant operators)
- The return temperature is too high (District heating operators)
- There are few measuring points in the network (District heating operators)
- The differential pressure is kept high (District heating operators)
- The storage tank is run by rule of thumb (District heating operators)
- Waste heat, combined heat and power, boilers and heat pumps are not coordinated (District heating operators)
- New low-temperature networks behave differently (District heating operators)
- Faulty substations raise return temperatures (District heating operators)
- The heat demand forecast is made by hand (District heating operators)
- Water travel times in the network are ignored (District heating operators)
- Industrial waste heat varies (District heating operators)
- Solar thermal fields with storage overheat or lose heat (District heating operators)
- Electric boilers are timed badly (District heating operators)
- Water losses go unnoticed (District heating operators)
- Deciding which streets to connect carries investment risk (District heating operators)
- Municipal heat plans need scenarios (District heating operators)
- Network control by fixed curves (District heating operators)
- Smart meter data is collected but not used (District heating operators)
- There are few network engineers (District heating operators)
- Loads, solar and storage on an industrial site are not coordinated (Solar parks and storage operators)
- Power peaks still hit despite the storage (Solar parks and storage operators)
- Assets in the portfolio consume, store and feed in at the wrong hours (Energy suppliers, traders and aggregators)
- Grid automation, digital substations and energy management need specialists (Grid operators)
- Operators may dim heat pumps and wallboxes without knowing the local grid state (Grid operators)
- Large heat pumps are new plants with few operating data and permit limits (District heating operators)
- Pump energy and reinjection pressure in deep geothermal plants (Geothermal plant operators)
- Server waste heat is too cool for the heating network (Data centres)
- Long superconducting cable lines need cooling loops over long distances (Grid operators)
- Distribution networks are planned for shrinking, uncertain gas demand (Gas grid operators)
- Funded transformation plans now have to be built and operated (District heating operators)
- Operating know-how retires with the people who carry it (Chemical producers)
- Manual grid operation cannot keep up with the grid's dynamics (Grid operators)
Check it on your plant first: a fixed-price remote diagnosis
EUR 4,500 net · 5 working days · remote · availability on request · freelance or through temporary agency work
Within a fixed scope and at a fixed price, I review your data, control structure and measurements remotely and tell you whether the problem on this page is behind your symptoms and what fixing it would take. You get a short summary for decision-makers and a technical report for your engineers.